top of page

Dulles Airport | Hangar 2

  • bannekerwebsite
  • Oct 7
  • 1 min read

CLIENT U.S. GSA & Metropolitan Washington Airport Authority

COST/BUDGET $406,000

LOCATION 23321 Autopilot Drive, Dulles VA

GENERAL CONTRACTOR Banneker Ventures

SIZE 8,500 SF

SECTOR Office & interiors


Project Overview

Banneker served as the prime contractor for the design-build modernization of the 2nd floor of the Aircraft Maintenance Facility at Washington Dulles International Airport, a major hub for domestic and international air travel with carriers that provide air service throughout the world.

This newly renovated space is used by the U.S. Transit Security Administration. Work included full architectural and engineering design, interior demolition of the entire 2nd floor, construction of a new HVAC system, plumbing upgrades, new millwork, new ceiling grid and tile, new sprinkler, construction of a canine room, installation of carpet and VCT flooring, upgrading of the fire alarm system, construction of a secure store room for use by the Transit Security Administration, significant low-voltage cabling and a new extensive physical security system. This fast-track design-build project was completed in 118 days (which includes design, permitting, and construction).


Dulles Airport Hangar Interior Photos




bottom of page