MCMILLAN WATER TREATMENT PLANT CAUSTIC SODA CONTAINMENT AREA CLEAN UP

Washington Aqueduct Division, Washington, DC

    This Task Order included clean-up of hazardous waste spill of sodium hydroxide at McMillan Water Treatment Plant. The scope included flushing and scraping caustic soda residuals from the interior surfaces of this containment area, which consists of 14 fiberglass tanks; seal containment area to prevent future leaks breaching the containment area; clean caustic soda residue from existing ceiling slab, walls, floors, pipes, and equipment; and install three 3” containment area floor drains and PVC drain piping below the slab and connect them to the primary floor drain. The project is being completed while the existing caustic soda feed system remains operational while only partial tank outages occur.

     

    Project Details

    Category
    Facilities / Maintenance

    Cost
    $4,000,000

    Client
    Department of the Army,USACE - Baltimore District

    Completed
    In progress