RENOVATION OF TSA OFFICES AT DULLES AIRPORT HANGAR 2

Dulles Airport, 23321 Autopilot Drive, Dulles, Virginia 20166

Banneker served as the prime contractor for the design-build modernization of the 2nd floor of the Aircraft Maintenance Facility at Washington Dulles International Airport, a major hub for domestic and international air travel with carriers which provide air service throughout the world.   This 8,500 square feet project is a new space used by the U.S. Transit Security Administration.  

Work included full architectural and engineering design, interior demolition of the entire 2nd floor, construction of a new HVAC system, plumbing upgrades, new millwork, new ceiling grid and tile, new sprinkler, construction of a canine room, installation of carpet and VCT flooring, upgrading of the fire alarm system, construction of a secure store room for use by the Transit Security Administration, significant low-voltage cabling and a new extensive physical security system.   This fast-track design-build project was completed in 118 days (which includes design, permitting and construction).  

 

Project Details

Category
Design-Build Construction

Cost
$406,000

Size
8,500 sq ft

Client
U.S. General Services Administration and Metropolitan Washington Airports Authority

End User
U.S. Transit Security Administration

Completed
July 2012-November 2012